Tuesday, 26 March 2019

House Build has started

My blog is so behind it kills me. I will catch up as life stops being so busy but for now I wanted to start documenting our house as it is being built.

But first lets go back a step or 5 or a year or more!!
Last time I posted about our build I said we were about to have a lot more rocks removed and a large spoon drain installed by a company who gave us guarantees and a fixed price quote............

Well to cut a long story short that ended up with me having to take them to court as they went to the property and quickly discovered they were well over their heads doing the job, broke their machine and left without actually doing the job. But they tried to charge us anyway!! 
It went to court and we managed to pay them what we thought the work they did was worth, not the amount they were trying to rip us off for.

I wont mention names but here is the broken down excavator and the half built drain they put in.


What a disappointing and stressful saga it turned out to be. Not to mention a waste of money and time. They set us back a few thousand dollars and at least 4 months.


We had to go through the whole re-quoting process and employ another company to remove the rocks. 

This time I will mention the company because they did a great job, very competent and got the job done. It was Paul Hawkins at H & A Contracting. Look him up if you need any big work done in Tassie. He will price it and stick to the price and he wont leave until he has completed the work to your satisfaction. 

Heres some pics of him in action.


I dont know how many 100's of tonnes of rocks he broke and moved but it was an epic job.


So we finally go the ground to where we could fit our house and shed. Or so we thought!!

We spent quite a bit of time plotting the house site with the builder and tossing up ideas of how to make it all work and we settled on a location that allowed us to make us of the massive drop off and give our house or outside deck the feeling of being up in the tree's.

Here we are marking the final location, everything fits and we have the 4 mtr gap between the house and shed that we wanted. 


We even did the 3D model of the area to make double sure everything works as we asked.


But then we went to council, had everything approved but the engineer decided at the 11th hour that he wouldn't sign off on the house being so far out on the massive fill site without an epic amount of pier work done before hand. The costs involved in that extra pier work were more than we were willing to spend so the compromise was to move the house over 3mtrs which only left us a 1mtr gap between the house and the shed!

It wasnt ideal as we also had to move the house back so one fo the bedrooms still had light coming in through the window which in turn removed some of the back yard.



We eventually got over it....well i doubt we ever will but thats life. And to be honest everytime we go out and see the house grow that one thing still annoys us.

Oh and also to meet the BAL fire rating we were also told we had to build a massive 23mtr long x 2.4mtr high colorbond fence up on the hill above the house in the worst possible location.
I asked 8 different fencing companies to quote it and not one of them wanted to do it. 

The only person willing to do the job quoted $15100....yes you read that right.

Just as I was thinking id have to work out a way to do it myself I came across a Facebook post about a small private fencing bloke that was recommended.......he quoted it reluctantly and got the job done.....$6400. Still a cost we had not budgeted but had to be done. Trust me a rang anyone and everyone trying to get out of it.

Here it is by the way.......we hate it but we will plant some tree's in front of it at some stage. I wouldn't mind meeting the boffin who said that we 'had' to have it.


______________________________________________

But around the end of January the build started.

Electrical and Plumbing rough in


Slab formwork


Slab Poured


Shed started


Shed built (wrong colour roller door, they will change it later) and frame started


Frame mostly complete


Roofers done and house wrapped


Windows in and brick work started


We then had our electrical placement meeting on site. This was the first time we had actually been inside the compound and therefore inside the house since they started.

It was really rushed which we later regretted but none the less we got some inside pics of the framing.

One conciliation was that even though the house was moved over 3mtrs we havent lost that suspended up in the tree's feel.



And not too much time later the brick work went up and from what we can see the plaster etc is going on inside. 




They have also brought in a lot of top soil and spread it out on the lower level. I think it is for the treatment plant waste water run off.


And here is the house today. End of March. No render on the front yet but it is well and truly going up.

The next step is for us to have another meeting on site with the tiler. So the next blog post will most likely be when it is finished or very close.

More house fit out photos..

Sooooo its been a while but here are the renders of the cabinetry from our joiner. 

Kitchen Breakfast bar


Main Kitchen


Walk in pantry



Hallway Linen Closet


Entry linen closet
Bathroom and Ensuite vanities



Walk in robe main bedroom


All other bedroom builtins


Saturday, 7 July 2018

Choosing new house colours and fitout

All this will be in our House Page  but we have finally chosen all our colours and fit out for the new house.

Externally it is a brick and render finish with custom orb colourbond roofing and tinted windows.

The bricks are Austral Metalix graphite with a light grey mortar.

The roof and windows are colourbond Monument and the render at the front, gutters, facias, eaves and house garage door are Shale Grey. The front door is a double strength Shale grey so a little darker.
The 'shed' or my man cave is all monument but with shale grey doors like the house.


Entry door is like this but without the side door panel.


All internal doors.


Entry linen, hallway linen are using this white glass sliders.
Bedrooms are using mirrored sliders.


Door furniture is Lane hardware.



Internal colours are all shades of grey or white. Boring for some perhaps but we prefer to use artwork etc for splashes of colour because it is easy to change!

Our flooring for most of the house is basic click floors using Godfrey Hirst Vista Timeless Grey.


The bedrooms and hallway use Pasha Kent carpet. Pics are a bit odd as it looks different in each but its grey ;)


The bathroom, ensuite, toilets and laundry are tiled using these tiles with a grey grout. The bathroom and ensuite have these tiles in the shower areas and skirting also. The laundry uses these as the splash back. The bathrooms have a large mirror above the vanities instead of a splash back.


Just some of our colour samples in a group. Kitchen benchtops, gloss white createc kitchen cupboards with a polytec textured darker top cupboard finish. White subway tiles using a darker grey grout.


Kitchen and study Benchtops. Polytec Navona Stone Matera finish. Using gloss white createc cupboards and or drawers.


Kitchen top cupoboards. Polytec Legato Maroso Milan.


Brushed stainless handles.


Westinghouse appliances but we used a different brand rangehood because we liked the style.

Dishwasher


900 Electric oven with gas cooktop.



Emilia Rangehood.


Laundry, bathroom and ensuite cabinet tops are Marble. Gloss in the Bathrooms and matt in the laundry.


Bathroom and ensuite vanitys are polytec black woodmatt finish with black handles.


Laundry uses createc gloss white cupboards and hamper. 

Laundry tap and sink.


Freestanding Bath


Vanity sink in bathroom and ensuite.


Bathroom and ensuite Taps, mixers and bath spout.

Bathroom shower head.

Ensuite shower head.


Shower drains.


Toilets.


Kitchen sink and tap.


Internal walls, architraves, skirting and internal doors are all painted dulux white on white.

50ltr Thermann Hot water unit.

Blinds are sunshade and block out all custom made.


Probably a fair bit of stuff I have missed!

Ill upload the 3d renders of the cabinetry work when they are emailed to us.